Uzbekistan Projects

Uzbekistan Projects

Consultancy services for supervision & control of civil works in partnership with Dongsung Engineering Co. LTD

1. ADB Loan no.4174-UZB

Contracts:

National Road Development Project, Construction Supervision Consultant (Civil Construction Works:

Lot 1: Reconstruction of 4R105 from Km5-37.5 including Design, Supply, and Installation of WIM System

Lot 2: Reconstruction of 4R105 from Km37.5-70

Lot 3: Reconstruction of 4R100 from Km128 -174 including Design, Supply, and Installation of WIM System

Brief Description of the Project:

The project consists of Cement Concrete Pavement. The works include rehabilitation of the existing 120km long section of the A380 highway in accordance with the SNIP standard. The existing 2-lane single carriageway asphalt road is upgraded to I category dual carriageway and double-lane highway with cement concrete pavement with a design speed of 120 km/h.

2. ADB Loan No.3963/3965-UZB

Contract No. KRP/OCB/QCBS-01

Reconstruction of 240 km of A-380 highway "Guzar-Bukhara-Nukus-Beyneu" section km 964-1204

Brief Description of the Project:

This project will rehabilitate the 240-kilometer-long section from km 964 to km 1,204 of the A380

Highway. The civil works include: (i) upgrading of the highway road from 2-lane without paved shoulders to a wider 3.75m 2-lane road with 0.75 m paved and 3.00 m unpaved shoulder using the existing RoW, (ii) replacement of old asphalt pavement with concrete cement pavement, and (ii) replacement/addition of culverts. Of the total 240 km project road, 61.5 km or 25% will follow the existing alignment while the rest, measuring 178.5 km, will be realigned. The general design speed for the road sections is 120 km/h. Road safety will be enhanced with the installation of traffic controls that include road signs, signal posts, traffic markings, lighting, bus stops, and sidewalks.